PROJECT LEAD Khartoum International Airport Sudan LOCATION Sudan PROJECT SCOPE Supply and installation of CCTV composed of 22 cameras for the Aerodrome Engineering Buildings at Khartoum Airport, February 2010. REQUIREMENT CCTV, ELV cable CCTV SYSTEM SOLUTION Verified compliance with both local and industry-specific requirements. ensuring that the selected camera would meet the installation’s environmental demands. Post time: May-28-2024